Transit Systems Project Planning and Feasibility Studies- Detailed Descriptions

Introduction

These proposed systems are located in the United States, Asia, Far East, Middle East, Africa, and Europe.  This planning work was performed for municipalities and other government clients, resort owners, system suppliers, private developers, and other private clients.  The system planning work included technology assessment & selection, conceptual and preliminary designs, route selection, plan & profile for alignments, system network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, life cycle cost estimation, feasibility reports, and preparation of presentations which included renderings, simulations and animations of proposed projects.  Our extensive People Mover and Monorail system planning experience includes a wide range of transit technologies for passengers and freight including monorail, maglev, air levitated, air propelled, cable supported, cable drawn, and small shuttles. We have also worked in a variety of site conditions, including city centers, high density city areas, lower density urban and rural areas, environmentally sensitive areas, historical areas, religious sites, national parks, obstacle crossings including over bays and inlets, river crossings, canyon crossings, freeway crossings, island access and intra-island transportation, universities, private resort developments, medical centers, shopping centers, industrial areas, shipping ports, airports, test tracks, theme parks and ski areas.

 

Istanbul Golden Horn People Mover

a

LG Performed site inspections of alignment and station sites.  Completed system planning including technology assessment, conceptual design, route selection, network capacity analysis, station and maintenance facility location selection, detailed renderings and animation of a vehicle approaching a station with passenger loading and vehicle departing the station, alternatives analysis for various alignments and major structure spans, value engineering to select vehicle sizes and guideway spans, and life cycle cost estimation.  This system is to be used to relieve congestion in a high traffic area near the city center and mosque, and to provide connections to the existing Light Rail and Subway systems.

Return to Top

Istanbul Palace People Mover

a

The Lamoreaux Group performed site inspections of alignment and station sites.  Completed system planning including technology assessment, conceptual design, analysis of steep grades for applicability to the technology selected, route selection, network capacity analysis, station and maintenance facility location selection, detailed renderings and animation of a vehicle approaching a station and departing the station, alternatives analysis for various alignments and major structure spans, value engineering to select vehicle sizes and guideway spans, and life cycle cost estimation.  This system is to be used to relieve congestion in a popular tourism area adjacent to the Bosphorous River and Istanbul Palace.

Return to Top

Swinoujscie Poland Shuttle Transit System

aCompleted technology assessment and selection, conceptual design, route selection, alignment design, network capacity analysis, station location selection, station configuration, alternatives analysis, value engineering to determine vehicle sizes and column spacing, and life cycle cost estimation.  This project is a vehicle transport system, to transport private cars from one side of a river to the other, using monorail container transport technology.

 

 

 

Return to Top

Royal Palace India People Mover

aCompleted system planning, conceptual design, network capacity analysis, station and maintenance facility location selection, alternatives analysis for number of travel lanes, value engineering to determine optimum column spacing, and life cycle cost estimation.  This project will connect resort facilities on the Indian coast  with an inland resort project.

 

 

 

Return to Top

 

Pusan – Jae Jong Dae People Mover
a
Performed system planning, conceptual design, route selection, network capacity analysis, station location selection, value engineering to determine best vehicle type and size, and life cycle cost estimation.  Performed site inspections of alignment and station sites. This project is to connected the city of Pusan, South Korea with Jae Jong Dae.

 

 

 

Return to Top

 

Pusan - Kimhae People Mover

a

Completed system planning, conceptual design, route selection, network capacity analysis, station location selection, value engineering to determine best vehicle type and size, and life cycle cost estimation. Performed site inspections of alignment and station sites.  This project is to connect the city of Pusan, South Korea to Kimhae.

 

 

 

Return to Top

 

Sokcho Resort People Mover

aCompleted system planning, conceptual design, route selection, plan and profile, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, life cycle cost estimation and feasibility report. Performed site inspections of alignment aand station sites, including integration with existing buildings and structures.  This transit system will connect lodging, business, convention, and national park facilities to ease traffic congestion in this resort area near the northern border of South Korea.

 

Return to Top

Chongqing Main Line Transit System
a
Assessed technology applicability, completed system planning, conceptual design, route selection, digitizing contour information for land and buildings, plan and profile, network capacity analysis, station and maintenance facility location selection, alternatives analysis of alignments and associated costs, value engineering to determine optimum vehicle size, column spacing, and alignment route, life cycle cost estimation and assistance in preparing the feasibility reports with ENFI Engineeringa from Beijing.  Visited the project site multiple times to investigate various design options, inspect potential station sites, and made two, week long presentations to the City of Chongqing regarding technology options and alignment alternatives.  This transit system will connect the main peninsula in the city center of Chongqing, across the Yangtze and Jialing Rivers to north and south areas of this city of 32 million people.  The project is associated with population being relocated to the city of Chongqing from the Three Gorges area of the Yangtze river, due to construction of the Yangtze river dam project.  The purpose of the project is to ease congestion in the city bus systems.

Return to Top

Chongqing Airport People Mover

aaCompleted system planning, conceptual design, route selection, network capacity analysis, station and maintenance facility location selection, alternatives analysis for various alignments, value engineering to determine pylon spacing and vehicle size, and life cycle cost estimation. Visited the project site multiple times to investigate various design options.  This system will connect the Chongqing Main Line Transit system just west of the downtown area, the Chongqing Chaotianmen Transit system at the city center, and the airport north of the city.  The project is associated with population being relocated to the city of Chongqing from the Three Gorges area of the Yangtze river, due to construction of the Yangtze river dam project.

Return to Top

Wuling Yuan/Jang Jie Je Resort People Mover
aaAssessed technology use at this People’s Republic of China National Park site near the city of Dayong (similar to Zions National Park in the United States), visited the site and hiked the alignment and visited station locations, completed system planning, conceptual design, route selection, digitized topographic information, prepared plan and profile design for a number of alternate alignments, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering to select vehicle type and size, life cycle cost estimation and feasibility report for installing a people mover system at this site.  A number of roads have washed out in the area including the main highway to reach the park, and the government is looking for alternatives including a people mover to resolve not only these difficult environmental conditions, but also to ease traffic, parking, and trail use congestion in the park.

Return to Top

Dalian Main Line Transit System

a

Completed system planning, conceptual design, route selection, network capacity analysis, alternatives analysis for various alignments, value engineering to determine pylon spacing and vehicle size, and life cycle cost estimation.  Visited the site to inspect the alignment and station locations proposed by the city, and reviewed alternatives with the city of Dalian representatives.

 

 

Return to Top

Dalian Bay Crossing People Mover

a

Assessed technology to use for the bay crossing, completed system planning, conceptual design, route selection, network capacity analysis, alternatives analysis for various alignments, value engineering to determine pylon spacing and vehicle size, and life cycle cost estimation.  Performed site inspections for the alignment and station locations proposed by the city, and reviewed alternatives with the city of Dalian representatives.

 

 

Return to Top

London Thames River People Mover

a

Completed system planning including technology assessment, conceptual design, plan & profile, network capacity analysis, station and maintenance facility location selection, renderings of London, aerial guideway structure and vehicle, alternatives analysis for different vehicle sizes, value engineering, and life cycle cost estimation.

 

 

 

Return to Top

a
Macau People Mover

Performed site inspections of the terminal station sites and bay crossing. Completed system planning including technology assessment for use at this site, conceptual design for pylons and foundations, profile at center ship crossing, network capacity analysis, alternatives analysis for different vehicle sizes, value engineering for pylon spacing, and life cycle cost estimation.  This people mover is proposed to connect Hong Kong with the island of Macau.

 

Return to Top

a
Hong Kong Resort People Mover

Completed system planning including technology assessment for use at this site, conceptual design for pylons and foundations, profile at ship crossing, network capacity analysis, alternatives analysis for differeant vehicle sizes, value engineering for pylon spacing, and life cycle cost estimation.  This people mover is proposed to connect the new Hong Kong international airport with this proposed resort project.

 

 

Return to Top

Wuxi Transit Systeam

Performed site inspections of the alignment, station sites, and maintenance facility site.  Completed system planning, conceptual design, route selection, alignment layout including interfaces with existing streets and buildings, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, life cycle cost estimation and feasibility reports. Completed cross section drawingss of downtown street interfaces, particularly for column locations.  This system connects urban areas to the city center, as well as providing a connection in phase II to a lake and high traffic tourism area.  Wuxi is an entertainment area for the residents of Shanghai, because of the lakes, mountains, and themed attractions.

Return to Top

Big Bear People Mover

Performed system planning in coordination with BRW, including conceptual and preliminary designs, route selection, plan & profile, network capacity analysis, station and maintenance facility location selection, detailed renderings and animations, alternatives analysis for 27 different alignments, vaalue engineering to determine column spacing and vehicle sizes, life cycle cost estimation and feasibility reports. Performed site inspections of alignment, station sites and maintenance facility.  Digitized topographic information in addition to obtaining digital elevation model data, and prepared digital terrain model for the proposed alignments.  Prepared presentation materials and assisted with the team presentation to the City of Big Bear.  This system is to connect San Bernadino with the ski resort area of Big Bear.

Return to Top

Milwuakee Medical Center People Mover

aCompleted system planning including technology assessment and selection, conceptual and preliminary designs, route selection, plan & profile, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, life cycle cost estimation, and prepared a feasibility.  Performed site inspections of alignment and station sites, and verified interfaces with existing medical buildings.  The alignment included a freeway crossing, connecting remote parking areas, retail and commercial areas, with the geographically separated buildings of the medical facility.

 

Return to Top

aGrand Canyon South Rim Transit System

Performed system planning including network capacity analysis, detailed renderings at multiple locations, alternatives analysis, value engineering to determine quantity and number of vehicles, and life cycle cost estimation.  The system is to connect parking and lodging facilities, the transportation center, and view points at the Grand Canyon.

 

 

 

Return to Top

Copper Mountain Ski Resort People Mover
a
Performed site inspection of the proposed alignment, completed system planning, network capacity analysis, alternatives analysis for changes to the proposed alignment, value engineering to determine best combination of vehicle size and quantity of vehicles, and completed a capital cost estimate to build the projects.

 

 

Return to Top

Houston Woodlands Industrial Park Monorail Freight System

a

Completed system planning, route selection and alignment layout, alternatives analysis for various alignment options interfacing with existing and proposed industrial buildings and estimate of the capital cost of construction.

 

 

 

 

 

Return to Top

PANYNJ NY Airport Access System JFK-LaGuardia
a
Completed system planning, analysis of the proposed alignment, alternatives analysis for alignment changes, alignment layout, capacity analysis, value engineering to determine optimum quantity and size of vehicles, and prepared a cost model for the capital cost of construction.

 

 

Return to Top

 

Puerto Rico People Mover

aCompleted system planning, route selection, plan and profile for the alignment, network capacity analysis, station and maintenance facility location selection, alternatives analysis to determine alignment location and grade, value engineering to determine quantity and size of vehicles, life cycle cost estimation and feasibility report.  This people mover is at a religious site in Puerto Rico, to connect parking facilities with the site, and to ease traffic congestion.

 

 

Return to Top

Covington/Cincinnati People Mover

a

Completed system planning, analysis of the proposed alignment, alternatives analysis for alignment changes, alignment layout, capacity analysis, value engineering to determine optimum quantity and size of vehicles, and prepared a cost model for the capital cost of construction.  Prepared presentation materials, and assisted in the presentation to the City of Covington, Kentucky.

 

 

 

Return to Top

Aerobus People Mover Test Track

aLG staff completed system planning, preliminary design, route selection, alignment layout, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering to determine the length and track configuration, and estimate of the capital cost of construction. Completed preliminary design of the cable and fixed guideway, station, maintenance facility and switching structures.  Prepared station and maintenance facility drawings.  Integrated a freight loading facility and vehicles, with passenger station and facilities. Managed final design of the vehicle car body by Intermountain Design and preliminary design of the bogies and chassis by APCO Technologies, including preparing detailed design specifications and design criteria.  The vehicle design included car body modules, bogies, chassis, lighting, doors and door openers, FRP shell, flooring, windows, interior finishes and seating.  Completed preliminary design of electrical and electronic systems, including vehicle HVAC system, traction drives and controller, on board PLCs and operator control console, vehicle ancillary electrical systems, and vehicle pantograph.  Completed preliminary design of the overhead contact system, and power substation.  Completed preliminary design of the maintenance and recovery vehicle, and freight vehicle, including bogies, chassis, operator cab, traction drives and controls, and vehicle hydraulic and electrical ancillary systems.  Completed computer renderings, simulation and animation of passenger and freight vehicles with guideway and station.

Return to Top

Houston Texas Medical Center People Mover

aCompleted system planning, preliminary design, route selection, alignment layout, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, detailed traction power/duty cycle analysis and report, life cycle cost estimation, and feasibility reports. Performed site inspections of alignment and station sites.

 

 

Return to Top

Disney California Adventure People Mover

Completed system planning, and preliminary design of at grade stations.  Completed the plan and profile, network capacity aanalysis, maintenance facility location selection, alternatives analysis for various alignment profiles, value engineering to determine station platform heights, number of vehicles and size of vehicles.  Also prepared a life cycle cost estimate, including capital and operations/maintenance costs.

 

Return to Top

Airtrans People Mover Test Track

aCompleted system planning, preliminary vehicle and guideway design, and prepared computer renderings, simulations, and animation of the vehicle, guideway and a passenger station.  Completed preliminary design of the vehicle including propulsion motor and controls, lighting and ancillary systems, frame, shell, flooring, windows, doors, interior finishes and seating.

 

 

Return to Top

a
Insul-8 People Mover Test Track

LG completed system planning, vehicle and guideway design, and prepared.  Vehicle design included adapting an existing vehicle to operate on the system, selection of traction drives and controls, and design of a communications based vehicle control system.  Guideway design included plan and profile, super-elevation design, structure and connections design, columns and switching structure.  We completed the vehicle velocity and acceleration profile, including triaxial passenger accelerations.

 

 

 

Return to Top

Downtown People Mover - Las Vegas

a

LG staff completed final alignment design verification using our proprietary computer programs for this guideway with spiral curves. Provided construction management services including guideway inspections at the Texas fabrication facility, and quality control during erection using high-precision, triangulated surveying methods to properly locate beams over columns, and accurately align beam to beam connections. Performed site inspections of alignment and station sites.  Magnetic Transit of America was purchased by Westinghouse, which stopped further project construction.

 

Return to Top

Hershey Park Monorail Rehabilitation

aCompleted cost estimates to replace the aging monorail trains installed in 1968. The vehicle cost estimate included car body modules, bogies, chassis, lighting, doors and door openers, FRP shell, flooring, interior finishes and seating, traction drives and controller, on board PLCs and operator control console, and vehicle ancillary electrical systems.

 

 

Return to Top

a
Mammoth Ski Area People Mover Upgrade

Visited the site and reviewed the existing system.  Completed conceptual design for the automated train control system upgrade.  Reviewed the existing train control system schematics to determine needed improvements.  Prepared a detailed cost estimate to upgrade the train control system.

 

 

Return to Top

Budapest People Mover

a

Completed system planning, network capacity analysis, station and maintenance facility location selection, alternatives analysis, value engineering, and life cycle cost estimate.

 

 

 

Return to Top

a
Mauritius Transit System

Completed route selection and cost estimation for this system.  This system is for intra-island transportation.  This island country is located approximately 500 miles east of Madagascar in the Indian Ocean.

 

 

Return to Top

aNorth Carolina Transpark

Prepared capital construction cost estimates for a monorail container transport system, for this shipping container port site.  Prepared a container transport vehicle rendering and animation, including loading of the container on the vehicle.

 

 

 

 

 

Return to Top

Port of Los Angeles

a

LG prepared capital construction cost estimates for a monorail container transport system, for this shipping container port site.  Completed plan and profile for the freeway crossing.  Prepared a container transport vehicle rendering and animation, including loading of the container on the vehicle.

 

 

 

Return to Top

Auraria Higher Education Center People Mover (Denver)

aCompleted system planning, preliminary design, route selection, alignment layout, network capacity analysis, station and maintenance facility location selection, alternatives analysis for guideway alignments and vehicle, and project capital construction cost estimate.  This monorail system is to connect parking facilities at Mile High Stadium with the college campus. Designed alignment, stations and maintenance building alternatives.  Completed a site inspection of the alignment, station and maintenance building locations.  Completed the preliminary guideway structural analysis for the freeway crossing.

Return to Top

aaa

St. Ceurge Transit System (Switzerland)

The Lamoreaux Group completed system planning, route selection, capacity analysis, and prepared a cost model for construction costs.

 

 

 

 

 

Return to Top

 

 